Home » Project Material » Cause Of Abandoned Public Development Projects

Cause Of Abandoned Public Development Projects

(Case Study Fcda Federal Capital Territory Abuja)

5 Chapters
|
41 Pages
|
4,708 Words
|
Estate Management

Complete Cause Of Abandoned Public Development Projects Project Materials (Chapters 1 to 5):

PROPOSAL

To review the projects work carry out an investigation of the causes of abandoned public development project in the federal capital territory Abuja case study of federal capital development authority (FCDA)
The project work will covered 34 pages chapter one serves as introduction, statement of research problems, scope and limitations, Aim and objectives and significance of the study.
Chapter two serves as literature review, abandonment, development, development process in building industry project, public sector involvement in housing development and types of public property.
Chapter three serves as methodology, data primary sources, secondary data and limitation.
Chapter four serves as data analysis, respondent views on causes abandonment, respondents views on the effect of abandonment, responandments views on the possible solution abandonment and discussions on the findings.
Chapter five serves as summary recommendations and conclusion, summary, recommendation, conclusion and referee cos.

ABSTRACT

The continues abandoning of public projects at various levels of development all over the country is of great concern not only to the governments themselves but more to civil servants who are too inadequately accommodated.
In this research work efforts have been made to identify, analyzed and discuss the basic causes of abandonment federal capital development Authority (FCDA) projects.
Chapter one serves as an introduction which outlines the background of the study, statement to the problems, aims / objectives of the study, research questions, significance of the study, scope of and limitations of the study plus overview of the study of the federal capital territory (FCT) Abuja.
Chapter two serves as literature reviews definition of special terms and also into introduces the reader to some housing policies in Nigeria.
The third chapter serves as research methodology where all the sources and method of data collection used in this work are explained.
Chapter four is the core of the research work where data collection from the filed are presented and analyzed.

TABLE OF CONTENT

Title Page
Certification
Approval Page
Dedication
Acknowledgement
Declaration
Abstract
Table Of Contents

Chapter One
1.0 Introduction

1.1 Background Of The Study
1.2 Statement Of The Problem
1.3 Aims / Objectives Of The Study
1.4 Research Questions
1.5 Significance Of The Study
1.6 Scope And Limitations Of The Study
1.7 Overview Of The Study

Chapter Two
2.0 Literature Review

2.1 Abandonment
2.2 Development
2.3 Development Process In Building Industry
2.4 Project
2.5 Public Sector Involvement In Housing Development
2.6 Types Of Public Property

Chapter Three
3.0 Methodology

3.1 Data Primary Sources
3.2 Secondary Data
3.3 Limitations

Chapter Four
4.0 Data Analysis

4.1 Respondents Views On Causes Abandonment
4.2 Respondents Views On The Effect Of Abandonment
4.3 Respondents Views On The Possible Solution Abandonment
4.4 Discussion The Findings

Chapter Five
5.0 Summary Recommendations And Conclusion

5.1 Summary
5.2 Recommendation
5.3 Conclusion
References

CHAPTER ONE

1.0 INTRODUCTION
Only little portion of government projects are executed by direct labour, while most of the development projects are awarded to contractions.
Public structures have been known to be abandoned in the cause of construction or left to dilapidate after being practically completed.
Incidents of abandoned projects are rampant all over the country e.g. from Enugu to ILorin, port Harcourt to sokoto and Lagos to Maidugwi. Projects of high capital cost. Such as residential buildings, office buildings and even road constructions.

1.1 HISTORICAL BACKGROUND OF THE FEDERAL CAPITAL TARRITORY VIZ – AVIZ FEDERAL CAPITAL DEVELOPMENT AUTHORITY ABUJA (FCDA)
The federal capital territory Abuja was created in 1976 by Decree No6 of that year which was established the federal capital development agency responsible for the design, construction and administration of the territory.
The decree also vested ownership and control for all land in the territory in the federal government of Nigeria. The territory which is located at the centre of the country covers an areas of 8000sqkm.
It is therefore more than twice the land area of Lagos state (93535sq.km) about two-thirds the size of Imo state (13032sq. km).
The federal capital territory itself is designed to cover an area of 256sq. Km or 3% of the total land area of the territory and at full development the city is expected to have a total population of 3.2 million.
In the FCT the duration of sunshine range from 6-8 hours per day in the south and 8-10 hours per day in the North from January to April / may. There is however a steep drop to a mean of about 4 hours per day in the month of July / August largely due to increase in cloud cover it starts again in the month of September.
Abuja, a virgin land with virtually no amenities of any sort before 1976 even where the pioneer civil servants would stay became a test case. Therefore Civil Servants had to stay in scattered level hotels in Suleja for residential accommodation and a borrowed Niger State Housing Estate had to be used as the Head Quarters of the FCDA.
The only road from Suleja to the Linther land of the territory was a colonial narrow tarred road.
FCDA is a parastatals under the Ministry for the Federal Capital Territory (MFCT) responsible for the physical development f the territory.
Under FCDA is the Development of Public Building and Engineering. The development of Public Building is in charges of designing and supervising f buildings while the Engineering Development, takes charge of road, dams and Electrical Services and bridges.
Most projects are executed through contractors while little is done by direct labour.

1.2 STATEMENT OF RESEARCH PROBLEMS
It has been observed that inspite f the effort put by government to brings to actualization the conception of its projects, public projects are still massively abandoned at different stages of construction.
What are the factors responsible for the abandonment of public projects?
This study is therefore geared towards examining the factors that cause abandonment of public sector development especially FCDA projects.
1.3 AIMS AND OBJECTIVES
The aims of this project are to examine the causes and effect f abandoned Public Development Projects in the Federal Capital Territory Abuja.
The above aim was drafted with the following objectives in mind.
(i) To establish and identify the cause of Abandoned public developmeent project in the Federal Capitals Territory Abuja.
(ii) To investigate the effect of the abandoned public development projects on the livs of the citizens.
(iii) To investigate its effects also on the environment.
(iv) To suggest possible solution to causes of abandonment of public development projects in the Federal Capital Territory Abuja.

1.4 RESEARCH QUESTIONS
(i) What are the possible causes of abandonment of Federal Capital Development Authority Project?
(ii) What are the possible effect of abandonment of such projects?
(iii) How can abandonment of public development projects be minimized in the Federal Capital Territory Abuja
(iv) What are the possible solutions to abandonment of public development projects in the Federal Capital Territory Abuja.

1.5 SIGNIFICANCE OF THE STUDY
(i) It will assist public sector development to avoid abandonment projects.
(ii) It will assist researches on similar topics.
(iii) It will educate the public on abandonment of projects and brief historical background of the FCT.

1.6 SCOPE AND LIMITATION
The scope of this project is only limited to the causes f Abandonment Public Development Project in the Federal Capital Territory Abuja with Federal Capital Development Authority (FCDA) as Area of Concentration (Case study)

1.7 OVERVIEW OF THE STUDY
The aim of the project is to examine the causes and effect of abandoned public development project in the Federal Capital Territory Abuja. Some of the causes which include inadequate funding or Bankcrupcy, lack of payment, high interest rate, inflation, improper planning, political reasons, delay in payment, corruption, bureacracy and back of special materials having its effect on lowering of living standard of the populace and as well making the environment look ugly among other effects. The chapter two made a reviews of related and relevant literature.
In the chapter three which is the methodology, both primary and secondary sources of data where used the percentage method. In chapter four the data acquired were presented on tables were analysed accordingly.

You Might Like These:

No other related project topic on this website

Project Structure

The introduction of Cause Of Abandoned Public Development Projects should start with the relevant background information of the study, clearly define the specific problem that it addresses, outline the main object, discuss the scope and any limitation that may affect the outcome of your findings

Literature Review of Cause Of Abandoned Public Development Projects should start with an overview of existing research, theoretical framework and identify any gaps in the existing literature and explain how it will address the gaps

Methodology of Cause Of Abandoned Public Development Projects should describe the overall design of your project, detail the methods and tools used to collect data explain the techniques used to analyse the collected data and discuss any ethical issues related to your project

Results should include presentation of findings and interpretation of results

The discussion section of Cause Of Abandoned Public Development Projects should Interpret the implications of your findings, address any limitations of your study and discuss the broader implications of your findings

The conclusion of Cause Of Abandoned Public Development Projects should include summarize the main results and conclusions of your project, provide recommendations based on your findings and offer any concluding remarks on the project.

References should List all the sources cited in Cause Of Abandoned Public Development Projects project by following the required citation style (e.g., APA, MLA, Chicago).

The appendices section should Include any additional materials that support your project (Cause Of Abandoned Public Development Projects) but are too detailed for the main chapters such as raw data, detailed calculations etc.