Home » Project Material » Construction Of 555 Timers And 741 IC Tester

Construction Of 555 Timers And 741 IC Tester

5 Chapters
|
66 Pages
|
9,464 Words
|
Electrical Electronics Engineering

Complete Construction Of 555 Timers And 741 IC Tester Project Materials (Chapters 1 to 5):

ABSTRACT

Integrated circuits (ICs) are the main component of each and every electronic circuit can be used for wide variety of purposes and functions. But sometime due to faulty ICs the circuit doesn’t work. Indeed it is lot tedious work to debug the circuit and confirm whether the circuiting is creating problem or the IC itself is dead. So to come up with these sorts of problems we intend to make a project which would confirm whether the IC under consideration is working properly or not. The purpose of testing is for measurement  of defects  and  quality level and each integrated circuit must be thoroughly checked in order to verify it  will function as designed. Hence this project titled “555 TIMERS AND 741 OP-AMPS INTEGRATED CIRCUIT  TESTER”  is designed to  enable electronic circuit  designers,  vendors  of  electronic  components,  even laboratories and schools to  design  workable  circuits  by making sure that the  ICs used  are functioning  properly.  This  integrated  circuit  tester will  be able  to test 555 timers and 741 op-amps.

TABLE OF CONTENT

COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT

CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE PROJECT
1.2 PROBLEM STATEMENT
1.3 AIM / OBJECTIVE OF THE STUDY
1.4 PROJECT MOTIVATION
1.5 SIGNIFICANCE OF THE PROJECT
1.6 LIMITATION OF THE STUDY
1.7 SCOPE OF THE PROJECT
1.8 PURPOSE OF THE PROJECT
1.9 METHODOLOGY
1.10 PROJECT ORGANISATION

CHAPTER TWO
2.0 LITERATURE REVIEW
2.1 INTRODUCTION
2.2 SOME EXISTING DOCUMENTARIES ON INTEGRATED CIRCUIT TESTER
2.3 EXISTING DIGITAL INTEGRATED CIRCUIT TESTER
2.4 FAULTS AND TESTING METHODS
2.5 DESCRIPTION OF 555 TIMER IC
2.6 HISTORICAL BACKGROUND OF 555 TIMERS
2.7 DESCRIPTION OF 741 IC

CHAPTER THREE
3.0 METHODOLOGY
3.1 SYSTEM BLOCK DIAGRAM
3.2 SYSTEM CIRCUIT DIAGRAM
3.3 CIRCUIT DESCRIPTION
3.4 COMPONENTS LIST
3.5 DESCRIPTION OF COMPONENTS USED

CHAPTER FOUR
4.0 TEST AND RESULT ANALYSIS
4.1 CONSTRUCTION PROCEDURE
4.2 CASING AND PACKAGING
4.3 ASSEMBLING OF SECTIONS
4.4 PACKAGING
4.5 MOUNTING PROCEDURE
4.6 TESTING
4.7 RESULT ANALYSIS
4.8 BILL OF ENGINEERING MEASUREMENTS AND EVALUATION

CHAPTER FIVE
5.1 CONCLUSION
5.2 RECOMMENDATION
5.3 REFERENCES

CHAPTER ONE

1.1 INTRODUCTION
In any manufacturing industry, there are continuous efforts to reduce cost, upgrade quality and improve overall efficiencies. In electronic industries, with the dramatic increase in circuit complexity and the need for the higher levels of reliability, a major contributor cost in any product can be in the testing. The purposes of testing is for measurement of defects and quality level and Each integrated circuit that leaves the factory must be thoroughly checked in order to verify it will function as designed However, taking into consideration that, in the real world, no product is perfect, testing will be an essential part of production in the foreseeable future. In industries, research centers and colleges where some common ICs are frequently used; many times have difficulties due to some faults in these integrated circuits. This makes it so essential to test them before using them in hardware implementation. Hence Integrated circuit tester is a good solution for these problems. This tester will be able to test 555 timers and 741 operational amplifier integrated circuits (i.c).

1.1 BACKGROUND OF STUDY
The dramatic increase in the use of digital integrated circuit (ICs) has created a need for a fast accurate means of testing such ICs. A test of an IC is a process which enables to determine if an IC is functioning properly. In the context of our country, most ICs bought in the market are considered functional. Thereby not subjected to any test before being used in a project. However, the fact that an IC has never been used doesn’t guarantee its functioning properly and it takes a long time to debug and identify a failure in a circuit in which new components have just been introduced. An IC tester is to be economically implemented for small or medium-scale users of such ICs (for example, in the lab, and electronic workshops)
And provides a quick but thorough check of its functions with minimal operator action. The IC tester can be used to test different ICs. The purpose of the IC tester is to ensure IC components are in good condition for use. To test an IC, different hardware circuits for different ICs are needed.
Hence it is needful to construct an IC tester in order to identify and separate healthy components from faulty ones.

1.2 PROBLEM STATEMENT
Integrated Circuits are the main components of each and every electronic circuit and can be used for wide variety and purposes. But sometimes due to faulty IC, the electronic circuit does not work. Since it is tedious work to debug the electronic circuit and to confirm whether it is the circuiting creating the problem or the IC is defective and the degree of the defect. An Integrated Circuit tester is necessary to confirm whether the IC to be used is functioning properly.

1.3 AIM / OBJECTIVE OF THE PROJECT
The main aim of this work is to conceive and realize a digital integrated circuit which can test basic ICs such 555 timers and 741 operational amplifier integrated circuits (i.c).
Specific objectives.

• To test 555 timers and 741 operational amplifier integrated circuits (i.c)
• To test NE55 timer and OPAM circuits like lm741 with or without the use of a microcontroller.
• To be able to detect the degree of defect found in the logic ICs.
• To increase the efficiency of Practical conducted in our school laboratory
• To make the realization of circuits in secondary and university institutions easy and reliable.

1.4 MOTIVATION
The IC testers available in the market today are too costly for individuals to own. Therefore we decided to construct an IC tester which is affordable and user-friendly. The motivation is to build an affordable IC tester which is able to test the functioning of OP Amp integrated circuits – LM741, and ICs NE555. The test sequence provided in the data base facilitates the detection of defective ICs. Furthermore, the tester must be easy to operate, compact, lightweight,

1.5 APPLICATION OF THE PROJECT
This is very useful for testing 555 timers and 741 op-amps used in circuits used by:
i. Electronics designers
ii. Electronics hobbyist
iii. vendors of electronic components
iv. Electronics workshop and also, it can be used in Electronics lab.

1.6 SIGNIFICANCE OF THE PROJECT
If a constructed circuit with 555 timers and 741 op-amp is not giving proper output means we can check every component in the circuit and can change faulty one with this circuit. It saves time and human effort for testing the IC giving out the result instantaneously. The tester is easy to operate, compact, lightweight.

1.7 LIMITATION OF THE STUDY.
This project is limited to designing and implementing an integrated circuit tester for 555 timers and 741 op-amp.

1.8 SCOPE OF THE PROECT
In this circuit we can test two most common ICs that is Timer IC555 and operational amplifier IC741, use 8 pin IC base for both timer and op-amp IC.
To check IC555 place the testing IC in base and watch the output LEDs. If the two output LEDs connected with pin number 3 glows alternately means the tested IC is good otherwise this can be a fault IC. By the same way if you testing IC741 means the output LED connected with IC741 should glow otherwise it can be a fault IC.

1.9 PURPOSE OF THE PROJECT
The purpose of this device is to provide a simple, fast and accurate means of testing 555 timers and 741 op-amp ICs.

1.10 METHODOLOGY
To achieve the aim and objectives of this work, the following are the steps involved:
i. Study of the previous work on the project so as to improve it efficiency.
ii. Draw a block diagram.
iii. Test for continuity of components and devices,
iv. Design and calculation for the device was carried out.
v. Studying of various component used in circuit.
vi. Construction of the circuit was carried out.
vii. Finally, the whole device was cased and final test was carried out.

1.11 PROJECT WORK ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work, chapter two presents the literature review of the study, chapter three describes the methods applied, chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.

You Might Like These:
Project Structure

The introduction of Construction Of 555 Timers And 741 IC Tester should start with the relevant background information of the study, clearly define the specific problem that it addresses, outline the main object, discuss the scope and any limitation that may affect the outcome of your findings

Literature Review of Construction Of 555 Timers And 741 IC Tester should start with an overview of existing research, theoretical framework and identify any gaps in the existing literature and explain how it will address the gaps

Methodology of Construction Of 555 Timers And 741 IC Tester should describe the overall design of your project, detail the methods and tools used to collect data explain the techniques used to analyse the collected data and discuss any ethical issues related to your project

Results should include presentation of findings and interpretation of results

The discussion section of Construction Of 555 Timers And 741 IC Tester should Interpret the implications of your findings, address any limitations of your study and discuss the broader implications of your findings

The conclusion of Construction Of 555 Timers And 741 IC Tester should include summarize the main results and conclusions of your project, provide recommendations based on your findings and offer any concluding remarks on the project.

References should List all the sources cited in Construction Of 555 Timers And 741 IC Tester project by following the required citation style (e.g., APA, MLA, Chicago).

The appendices section should Include any additional materials that support your project (Construction Of 555 Timers And 741 IC Tester) but are too detailed for the main chapters such as raw data, detailed calculations etc.