Home » Project Material » Construction Of Automatic Change Over With Generator Trip Off

Construction Of Automatic Change Over With Generator Trip Off

5 Chapters
|
36 Pages
|
4,110 Words
|
Electrical Electronics Engineering

Complete Construction Of Automatic Change Over With Generator Trip Off Project Materials (Chapters 1 to 5):

ABSTRACT

As technological advancement has been on the increase in our society many have fallen in love with technology and world want to have a feel in virtually to every thing they do.
A design has been made in combination of electrical and electronics to change over from one power sources to the other automatically and trip off generation after 40 seconds with out going through the point for manual operation. This project writing were organized in according way for easy understanding

TABLE OF CONTENT

Title Page
Approval Page
Acknowledgement
Abstract
Table Of Content
Table Of Figure

 

Chapter One
1.0 Introduction

1.1 Design Objectives
1.2 Significance Of The Project
1.3 The Project Report Models Relevant To The Design

Chapter Two
2.0 Literature Review

2.1 System Component Analysis
2.2 Theories And Models Relevant To The Design

Chapter Three
3.0 System Design

3.1 Description Of The System Building Blocks
3.2 System Specification And Block Diagram
3.3 Description Of Overall Operation Of The System
3.4 Complete Circuit Diagram Of The System

Chapter Four
4.0 Implementation Testing And Results

4.1 Packaging Of The System

Chapter Five
5.0 Cost Analysis

5.1 Conclusions And Recommendation/Suggestion
For Further Implementation
References

CHAPTER ONE

1.0 INTRODUCTION
This project is on the design and implementation of automatic change over and how it can be used to change from one power sources to the other automatically. The design comprises some arrangement that senses the power failure form either of the power sources and drives the electro mechanical switching device (relay) that is capable of changing two poles (live and neutral) to give out light or be on stand by to generator side.

1.1 BACKGROUND
As technological advancement has been on the increase in our society many have fallen in love with technology and wants to have a feel of modern technology in virtually to every thing they do.
A design have been made in combination of electrical and electronics to change over from one power sources to the other automatically without many operation.
Electronic components such as relay transformer diodes were used thereby making the project less expensive for the implementation of the project and commercial application.
Moreso the cost suitability and availability of the required components for the project circuitry were some of the major factors considered by the designer

1.2 AIM/OBJECTIVES
To design a circuit that will automatically change over from main power supply (PHC) to power generating set and vice versa with the help of electro mechanically switching device that is being controlled by electronics component

1.3 SCOPE/SIGNIFICANCE
This project design can be used to transfer power sources to the other automatically. The design could also be used in other application apart from changing power sources once there is a well though arrangement

1.4 PROJECT REPORT ORGANIZATION
The project report has been organized into five chapters for orderliness and easy understanding of the information on the report design.
Chapter one contains introduction design objectives/aim scope/significance of the report and report organization
Chapter two dealt on system component analysis literature review and theories/modules of design.
Chapter three contains the system design description of the system building blocks system specification block diagram and the description of the overall operation of the system.
Chapter four describes the implementation testing and results of the project.
Chapter five finally dealt on the cost analysis calculation and recommendation for further improvement and ended with a page for references .

You Might Like These:
Project Structure

The introduction of Construction Of Automatic Change Over With Generator Trip Off should start with the relevant background information of the study, clearly define the specific problem that it addresses, outline the main object, discuss the scope and any limitation that may affect the outcome of your findings

Literature Review of Construction Of Automatic Change Over With Generator Trip Off should start with an overview of existing research, theoretical framework and identify any gaps in the existing literature and explain how it will address the gaps

Methodology of Construction Of Automatic Change Over With Generator Trip Off should describe the overall design of your project, detail the methods and tools used to collect data explain the techniques used to analyse the collected data and discuss any ethical issues related to your project

Results should include presentation of findings and interpretation of results

The discussion section of Construction Of Automatic Change Over With Generator Trip Off should Interpret the implications of your findings, address any limitations of your study and discuss the broader implications of your findings

The conclusion of Construction Of Automatic Change Over With Generator Trip Off should include summarize the main results and conclusions of your project, provide recommendations based on your findings and offer any concluding remarks on the project.

References should List all the sources cited in Construction Of Automatic Change Over With Generator Trip Off project by following the required citation style (e.g., APA, MLA, Chicago).

The appendices section should Include any additional materials that support your project (Construction Of Automatic Change Over With Generator Trip Off) but are too detailed for the main chapters such as raw data, detailed calculations etc.