Design And Construction Of House Bell With Indicating Light
Complete Design And Construction Of House Bell With Indicating Light Project Materials (Chapters 1 to 5):
Title Page
Approval Page
Acknowledgement
Dedication
Abstract
Chapter One
1.0 Introduction
Chapter Two
2.0 Literature Review
2.1 Preamble
2.2 Essential Parts Or Features Of An Electric Ball
2.3 The Main Call Line
2.4 The Sub – Call Line
Chapter Three
3.0 Materials And Methodology
3.1 Introduction
3.2 Materials
3.3 The Wooden Board
3.4 Switches
3.5 Lamp Holder
3.6 Cable
3.7 Electric Bell
3.8 Filament Lamp
3.9 Plug
3.10 Joint Box
3.11 Wooden Block
3.12 Nails
3.13 Screw Nail
3.14 Clip
3.15 Methodology
3.16 Mode Of Connection And Construction
Chapter Four
4.0 Principle Of Operation
4.1 Schematic Diagram Of An Electric Bell With Light Indictor
4.2 Mode Of Operation
Chapter Five
5.0 Result Analysis And Discussion
5.1 The Input Stage
5.2 The Power Supply Stage
5.3 Use And Economic Importance
5.4 Use Of The Call System In Hotel Building
Chapter Six
6.0 Conclusion And Recommendation
6.1 Problem Encountered
6.2 Conclusion
6.3 Recommendation
References / Bibliography
1.0 INTRODUCTION
To cleanly understand the wood information technology and communication which is the life blood of all human activities the assimilation of communication technology is of great important. The development of communication technology in any nation makers communication technology easy and pleasant. And one of basic building block of a communication system is the house bell indicating which serves as inter-call light to ensure proper communication within an officer or domestic.
An electrical bell can be define as dunce which can be use to alent signal for indicating of problem in alarm signals.
The device is classified according to were types, mode of operation and the application there are numerous types of alarming signals but for the purpose of this project an electric bell with light indicator is considered.
These device receives its input signal form an electrical device known as bell push. That was connected at the wing board Via joint box. The signal (current) passes through the wire and fed into the bell which cause the bell to ring in order to alent the receiver.
Furthermore, the objective of these house ell is to provide a cheap and continent means of communication between two or more people in the same premises.
The major different between inter- communication system using telephone and electric bell is that the signal is transmitted by the call indicator system in place of speech as in the case of the telephony.
The introduction of Design And Construction Of House Bell With Indicating Light should start with the relevant background information of the study, clearly define the specific problem that it addresses, outline the main object, discuss the scope and any limitation that may affect the outcome of your findings
Literature Review of Design And Construction Of House Bell With Indicating Light should start with an overview of existing research, theoretical framework and identify any gaps in the existing literature and explain how it will address the gaps
Methodology of Design And Construction Of House Bell With Indicating Light should describe the overall design of your project, detail the methods and tools used to collect data explain the techniques used to analyse the collected data and discuss any ethical issues related to your project
Results should include presentation of findings and interpretation of results
The discussion section of Design And Construction Of House Bell With Indicating Light should Interpret the implications of your findings, address any limitations of your study and discuss the broader implications of your findings
The conclusion of Design And Construction Of House Bell With Indicating Light should include summarize the main results and conclusions of your project, provide recommendations based on your findings and offer any concluding remarks on the project.
References should List all the sources cited in Design And Construction Of House Bell With Indicating Light project by following the required citation style (e.g., APA, MLA, Chicago).
The appendices section should Include any additional materials that support your project (Design And Construction Of House Bell With Indicating Light) but are too detailed for the main chapters such as raw data, detailed calculations etc.