Home » Project Material » Design And Fabrication Of A Mobile Refrigerator

Design And Fabrication Of A Mobile Refrigerator

(A Case Study Of National Population Commission)

5 Chapters
|
57 Pages
|
6,711 Words
|
Mechanical Engineering

Complete Design And Fabrication Of A Mobile Refrigerator Project Materials (Chapters 1 to 5):

ABSTRACT

To contribute to the development of Engineering and Technology innovations. The research work carried out in this project will help greatly in that direction. We exphasised mainly on modern methods by which a refrigerator can be operated and maintained we also included the method used in design and fabrication, assembly and arriving at knowing the safety requirement.
During the process of production of this refrigerator, cost estimate is taken into consideration with durability of materials, portability of the product was also considered.
NOMENCLATURE
M = Mass
A = Area
S = Entropy
V = Volume
M = Mass Flow Rate
D = Diameter
G = Gravity
 = Density
T = Temperature
H = Enthalpy Difference
Q = Heat Quantity
M = Latent Heat of Fusion
gr = Equivalent Load
L = Length
P = Pressure
U = Internal Energy
R = Thermal Conductivity
X = Thickness of Material
COP = Co-efficient of Performance
Q = Heat Transfer Per Area
HP = Horse Power
Vs = Swept Volume
AC = Alternative Current
C = Specific Heat
O = Gauge

TABLE OF CONTENT

Title Page
Letter of Transmittal
Release Page
Signature Page
Dedication
Acknowledgment
Abstract
Table of Contents

Chapter ONE
1.0 Introduction

Chapter TWO
2.0 literature review
2.1 The Reverse Carnot Cycle
2.2 Modification of the Ideal Cycle Vapour Compression Cycle
2.3 Condition of Refrigerants in Compressive Inlet
2.4 Definitions of Terms

Chapter THREE
3.0 Detailed Information Needed for the Construction/Consideration of the Principle
3.1 Safety Consideration
3.2 Unit Description
3.3 Methods of Construction and Procedures
3.4 Fitting of the Evaporator
3.5 Other Assembly

Chapter FOUR
4.0 Mobile Calculation and Analysis
4.1 Heat Leakage Through and Boundary
4.2 The Product Load
4.3 Co-efficient of Performance

Chapter FIVE
5.0 Defrosting
5.1 Analysis and Material Cost Value
5.2 Labour Cost
5.3 Recommendation
5.4 Complaints, Causes and Remedy
References

CHAPTER ONE

1.0 INTRODUCTION
It was noticed that people living in the regions close to ice line, that the flesh of animals, or fish caught during the winter kept well, while those caught during the summer decayed as the snow melts.
The value of ice as a preservative was known and put into use some thousands of years ago. In winter it was cut, and moved into ice house which was built into the ground to make use of the insulating properties of tyer soil; such structures was described as shin chiny by Chinese poet.
Also, in the Middle East, and India, water was chilled by evaporating it through porous clay ports, which were buried overnight in favourable conditions, it could be made cooled enough to form ice.
About 1748, William Cullen made the first move toward the use of a modern system by investigating the effect of evaporating ethyl either into a partial vacuum. Not until 1834 that Jacob Perkins patented a closed – cycle refrigeration system using a compressor. It also patented a high pressure hot water heating circuit the same year.
An air – cycle plant for making ice and to cool air for circulating was developed by John Girrie ten years later, through his hospital in flourish. This was the beginning of the race with new beginning of new Engineering innovations following quickly after new scientific theories. Much development work was found on vapour compression system in 1850’s
James Harrison units for meat freezing and brewery applications in Australia while twinning ice – making equipments earned round in USA.
The introduction of ammonia as a refrigerant enabled efficiency and reliability to be improved in later years. This new founding inspired new generation of reciprocation compressors which was used by Ferdinand Carrie in the first viable absorption refrigeration system.
In the 19th century, refrigeration cam of age due to some work by William Thompson who later became Lord Kelvin. The products of his Long Life (1832 – 1907), reflect many interests ranging from refrigeration’s to telegraphy. In retrospect, refrigerating or refrigerants did more that anything to hold up the development of refrigeration. Many of those refrigerants were poisonous or explosive or both, while others functions only at pressure so high as to require compressors and system components to be constructed like battleships, with prime movers to match it.
In 1928, the vice president of united state of America became convinced that refrigeration could get nowhere unless a new refrigerant could be found to substitute the poisonous ammonia.
This problem was passed to research chemist Thomas Midgely; Midgley and his associales Hennece and Mc Nary had an idea of using a compound containing fluorine to solve the problem. It took them only two days to find it. This was done by removing two atoms of chlorine from tetrachlornmethan (carbon tetrachloride) molecules and replacing them with two atoms of fluorine to make the compound dichlorodifluro methan CC12F2.
Tests confirmed this compound to be suitable, non – flammable and usually low level toxic. This new refrigerant was name from 12 (R12) by the sole administrator of the company. It enables equipment manufactures to think in terms of smaller and highly built compressors and system components than the previous ones. Some of the properties of R12 that made it more acceptable are:-
1. It does not attack coppers
2. it is not toxic
3. it is not explosive
can be used for both air – conditioning as well as refrigeration. This development was restricted by the 2nd world war.
The end of the war made manufacturing facilities available and there was a boom in refrigeration and air – conditioning which has continued up to this day. The boom up to the domestic appliances revolutionized the refrigeration industry and its commercial outlets. Bigg4er and better cold stores were needed at the deck certainly, but new cold stores were demanded by complete distribution, chains refrigeration was not for imported foods alone. Demand came all sides plant to freeze vegetables close to the fields.
These were other areas for expansion apart from food, to answer medical needs for blood banks, for antibiotic, for making ice for compresses and low temperature surgery and for preserving certain tissues that pathologists worked on.

You Might Like These:

No other related project topic on this website

Project Structure

The introduction of Design And Fabrication Of A Mobile Refrigerator should start with the relevant background information of the study, clearly define the specific problem that it addresses, outline the main object, discuss the scope and any limitation that may affect the outcome of your findings

Literature Review of Design And Fabrication Of A Mobile Refrigerator should start with an overview of existing research, theoretical framework and identify any gaps in the existing literature and explain how it will address the gaps

Methodology of Design And Fabrication Of A Mobile Refrigerator should describe the overall design of your project, detail the methods and tools used to collect data explain the techniques used to analyse the collected data and discuss any ethical issues related to your project

Results should include presentation of findings and interpretation of results

The discussion section of Design And Fabrication Of A Mobile Refrigerator should Interpret the implications of your findings, address any limitations of your study and discuss the broader implications of your findings

The conclusion of Design And Fabrication Of A Mobile Refrigerator should include summarize the main results and conclusions of your project, provide recommendations based on your findings and offer any concluding remarks on the project.

References should List all the sources cited in Design And Fabrication Of A Mobile Refrigerator project by following the required citation style (e.g., APA, MLA, Chicago).

The appendices section should Include any additional materials that support your project (Design And Fabrication Of A Mobile Refrigerator) but are too detailed for the main chapters such as raw data, detailed calculations etc.