Home » Project Material » Production Control System

Production Control System

(A Case Study Of Anammco Nigeria Limited Eneme Enugu State)

5 Chapters
|
49 Pages
|
5,506 Words
|
Computer Engineering

Complete Production Control System Project Materials (Chapters 1 to 5):

ABSTRACT

The theme of the research work is production control system software, (A case study of Anammco Nigeria Ltd Emene Enugu, Enugu State.
The objective of this work is to bring it to emphasis on a new system that will help improve production control system software in production companies
The problem encountered during this research work project can be affected at factors. Problem encountered in this research work have been classified into technical and non-technical problem
The major problem encountered during the research work is the problem of inadequate material to provide enough used information about the bill of material used in Anammaco and their defailed analysis.
Also the non technical problem encourtered is the problem of time to necessary of information and acquiring necessary material used in Anammco
All these factors contributed to set back of this research work
Observation and analysis so far made in this research has clearly show that the importance of bill of materials and its study cannot be over emphasized.
Finally, this program will help Anammco in keeping accurate records for their staff. It will also help them to reduce rechdancy in their staff record stored in database.

TABLE OF CONTENT

Title page
Certification
Dedication
Acknowledgement
Abstract
Table of contents

CHAPTER ONE
1.0 INTRODUCTION
1.0 Background of the study 1
1.2 Statement of problem 3
1.3 Purpose of the study 4
1.4 Scope of the study 3
1.5 Significance of the study 5
1.6 Limitation of the study 5
1.7 Definition of terms 6

CHAPTER TWO
REVIEW OF RELATED LITERATURE
2.1 Introduction 8
2.2 Literature review 10

CHAPTER THREE
SYSTEM ANALYSIS, METHODOLOGY AND DESIGN
3.1 Introduction 13
3.2 Methodology 13
3.3 Analysis of case study 14
3.3.1 Organizational structure 15
3.3.2 Sources of data 16
3.3.3 Procedures in the current system 17
3.4 Overall data flow diagram (DFD) of the
current system 20
3.5 Files and Record 22
3.6 Problems associated to the current system 24
3.7 New system design 25
3.7.1 System proposal 27
3.7.2 Proposed system high level model 28
3.7.3 Design objective 29
3.7.4 Input/output specification 29

CHAPTER FOUR
SYSTEM DEVELOPMENT AND IMPLEMENTATION
4.1 Introduction 31
4.2 Control center/main menu 31
4.3 Program development 31
4.3.1 Language selection 32
4.3.2 Program module 32
4.3.3 System flow chart 33
4.3.4 Program flow chart 35
4.3.5 Program codes/sources program 36
4.4 Program implementation 36
4.4.1 Documentation and installation 36

CHAPTER FIVE
SUMMARY, CONCLUSIONS AND RECOMMENDATIONS 39
5.2 Summary 40
5.3 Conclusion 40
Recommendation 42

CHAPTER ONE

INTRODUCTION AND BACK GROUND OF THE STUDY
1.0 PRODUCTION CONTROL SYSTEM SOFTWARE
In his definition K.G Hackyer, defined production in 1990 as an act of putting together human being, material, plant and money in order to provide goods and services. The success of production comes about as a result of effective framework of the cooperate objective production takes place in an environment called a factory. This factory is a place where people are employed for the purposes of making, altering repairing and ornamenting, finishing, clearing, washing, breaking and adopting forsale of any article.
The factory is regarded as a continued staff, self sufficient body and its depending upon integration with the rest of the system are recognized only when other parts of the organization charge. Although this view is fast changing the dangers of these vision are great, for example government legislation may force a marketing change which requires a design modification in turn, can alter production processes in such a way that operations may be displayed with consequent redundancy and retaining problems
These problems would have been seen and their effects integrated if conscious efforts are made by the managers to look outside the four wall of their over production units. Similarly a board decision to change form a selling policy where orders are accepted to a marketing policy where orders are sought will inevitably demand major changes in the whole system of factory management. Again, this can be foreseen it the factory managers look inwards and outwards
Further more, the factory itself provides the environment for its own constituent department and again the interaction of the parts within themselves and with the host environment. The interdependency between the two produces important consequences
a. Changes in the environment, which imposes changes in the organization and
b. Changes within the firm affects the environment to survive therefore, organization must be prepared to responded to change and managers must not think as if any decision to affect a change is only internal

1.2 STATEMENT OF PROBLEM
The fact that most organization now handles large volume of data/information that needs to be disseminated to different users to evolve effective corporate management and improved customers service. The information needed to carryout operation secured towards customers satisfaction need must be transmitted properly and timely too
More also, non-availability of efficient funds as well as management for maximization of profits with fewer cost demands that some limited facilities like printers, hard drive fax, moderns is shared among users.

1.3 PURPOSE OF TH STUDY
The purpose of this research work is to divulges the concept of production control system software accentuating the technology behind them in terms of equipments, need and general operations
Another reason is to expose the areas where the technology can be applied

1.4 SCOPE OF THE STUDY
The system is a tool for controlling production functions that go on daily in a motor manufacturing company. For this reason, aspect of production control such as scheduling and manufacturing authorization is not covered, including some aspects of dispatch process. This system handles the materials (stock) control but does not go into the purchasing and costing. It provides the necessary reports that help in determine when to make purchase it generates the bills of various models or vehicles produced in ANAMMCO
It monitors and controls the activities of various parties to provides timely information that bears on meeting schedules

1.5 SIGNIFICANCE OF THE STUDY
This research work will help to access and document reports from various departments within the company, which will affect immediate decision making. It will also solve the problem of misplacing important document and inaccurate recording. The system will help to meet up with customers order and eliminate the problem of broken promise

1.6 LIMITAION OF THE STUDY
It is a listed and proved fact that the road to success is smooth; therefore, the researcher encounters some hindrances.
Some of them worth mentioning are:
1. Time constraint
2. Financial constraint

1.7 DEFINITION OF TERMS
For a clear understanding of the terminology used the following terms are hereby operationally defined
Computer
It can b e defined as a device that accepts data in one form (input) and processes it to produce data in another form (output) as information
Program
This is a set of instruction written on a language of computer. A program is used to make the computer perform a specific task as calculating interest paid to saving account holder
System
This is a set of related, interacting and inter-connecting dependent element forming a collective entity. It is also a collection of inter-related produces to achieve a specific goal
Software
These are sets of instructions that are to be carried out by computer in order to accomplish a given task
Hardware
These are those parts of the computer that we can touch and see (physical parts) e.g keyboard, monitor, mouse etc.
Flowchart
This is a pictorial representation, which shows by means of symbols and inter-connecting lines, the operation or data flow on an information data processing
Data
This is regarded as an unprocessed fact of figure
Information
This is processed data

You Might Like These:
Project Structure

The introduction of Production Control System should start with the relevant background information of the study, clearly define the specific problem that it addresses, outline the main object, discuss the scope and any limitation that may affect the outcome of your findings

Literature Review of Production Control System should start with an overview of existing research, theoretical framework and identify any gaps in the existing literature and explain how it will address the gaps

Methodology of Production Control System should describe the overall design of your project, detail the methods and tools used to collect data explain the techniques used to analyse the collected data and discuss any ethical issues related to your project

Results should include presentation of findings and interpretation of results

The discussion section of Production Control System should Interpret the implications of your findings, address any limitations of your study and discuss the broader implications of your findings

The conclusion of Production Control System should include summarize the main results and conclusions of your project, provide recommendations based on your findings and offer any concluding remarks on the project.

References should List all the sources cited in Production Control System project by following the required citation style (e.g., APA, MLA, Chicago).

The appendices section should Include any additional materials that support your project (Production Control System) but are too detailed for the main chapters such as raw data, detailed calculations etc.